WA: Yurralyi Maya Pipeline

WA: Yurralyi Maya Pipeline

The Yurralyi Maya Pipeline is a transmission pipeline owned by Hamersley Iron Pty Ltd.

The lateral was built in 2010. It is a 10 inch diameter pipeline that is 1.2km long. Its operating pressure is 10.2Mpa MOAP. The Yurrakyi Maya Pipeline is currently a non-scheme pipeline, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 20 June 2019, the ERA granted a five-year Category 1 and 2 exemption under Part 23 of the NGR for the Yurrakyi Maya Pipeline. 
 

Pipeline details

State:

WA

Type:

Transmission

Capacity:

10.2Mpa MOAP

Regulation:

Non-scheme

Additional Regulation:

Category 1 and 2

Owner:

Hamersley Iron Pty Ltd

Operator:

Hamersley Iron Pty Ltd

Length:

1.2 km

Gas Type:

Natural gas

Contact us

Title Date Documents
Exemption Application – Yurralyi Maya Pipeline (PL78) 2018-11-16
Yurralyi Maya Pipeline - Map
Rotate phone landscape for better viewing