The Ti West Lateral Pipeline is a pipeline owned by APT Parmelia and operated by APA Group.
The Ti West Lateral Pipeline interconnects with the Parmelia Gas Pipeline mainline and is a single shipper pipeline. The lateral was built in 2002. It is a 4"(11cm) diameter pipeline that is 4.3km long. Its operating pressure is 7.48Mpa MAOP. The Ti West Lateral Pipeline is a non-scheme pipeline and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 8 May 2023, the ERA granted a 5 year Category 2 and 3 exemption under Part 23 of the NGR for the Ti Lateral Pipeline.