The Leonora Lateral Pipeline is connected to the Goldfields Gas Pipeline at approximately 1,142.8km along the pipeline. The Leonora Lateral Pipeline is approximately 16.5kms in length. The lateral runs from the Goldfields Gas Pipeline offtake to the Leonora Power Station. The Leonora Lateral Pipeline is currently a non-scheme pipeline under Chapter 6A of the NGL and Part 23 of the NGR. On 8 August 2018, the ERAWA granted a 5 year Category 2 and Category 3 exemption under Part 23 of the NGR for the Leonora Lateral. On 2 August 2023, the ERAWA granted a 5 year Category 1, 2 and 3 exemptions under Part 23 of the NGR for the Leonora Lateral.