Bullsbrook Lateral Pipeline is a distribution pipeline located in South-West, WA.
The lateral was built in 2000. It is a 4" (11cm) diameter pipeline that is 0.2km long. Its operating pressure is 7.48Mpa MAOP. The Bullsbrook Pipeline is currently a non-scheme pipeline, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 8 May 2023, the ERAWA granted a five-year Category 2 and 3 exemption under Part 23 of the NGR for the Bullsbrook Lateral Pipeline.