The Kleenheat Production to Australian Gold Regents Pipeline is a transmission pipeline in Kwinana, WA.
The pipeline was constructed in 1998. It is approximately 3.4km and and run underground for approximately 3.3km. It is 168.3mm and operates at a normal pressure of 2850kPa. The pipeline is designed for 10TJ a day at an inlet pressure of 2.85MPag. The Kleenheat Production to Australian Gold Reagents Pipeline is currently a non-scheme distribution network, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 25 September 2018, the ERAWA granted a five-year Category 1, 2 and 3 exemption under Part 23 of the NGR for the Australian Gold and Reagents Pipeline.