The Goldfields Gas Pipeline (GGP) is the gas transmission pipeline system defined in Pipeline Licence 24 (as amended) issued under the Western Australian Petroleum Pipelines Act 1969.
 
The GGP extends from Yarraloola, in the Pilbara region of Western Australia, to Kalgoorlie, in the Goldfields-Esperance region.
 
The pipeline system defined in Pipeline Licence 24 includes the pipeline between the Quadrant Energy meter station near Yarraloola and the Yarraloola Compressor Station.  It also includes a part of the pipeline which interconnects the GGP with the Dampier to Bunbury Natural Gas Pipeline upstream of the Yarraloola Compressor Station.
 
The Newman Lateral, which extends 48 km from the GGP main line to the town of Newman, is part of the pipeline system defined in Pipeline Licence 24.  None of the other lateral pipelines extending from the GGP main line is part of the pipeline system defined in Pipeline Licence 24.
 
Construction of the GGP was completed in 1996.  The GGP mainline comprises two principal segments:  520 km of 406 mm diameter pipe between Yarraloola and the Newman Lateral offtake, and 857 km of 356 mm diameter pipe between the Newman Lateral offtake and Kalgoorlie.  Compressor units were initially installed at Yarraloola (Units 1 and 2) and Ilgarari.  The gas transportation capacity was of the pipeline was subsequently expanded by the addition of compression at Wiluna in 2001, and at Paraburdoo (Unit 1) in 2004.  Compression was subsequently added at Yarraloola (Unit 3), Wyloo West, Paraburdoo (Units 2 and 3), Turee Creek, and Ned’s Creek.
 
The GGP is owned by the participants in the Goldfields Gas Transmission Joint Venture.  The participants are currently Southern Cross Pipelines Australia Pty Ltd, Southern Cross Pipelines (NPL) Australia Pty Ltd and Alinta Energy GGT Pty Ltd. Southern Cross Pipelines Australia Pty Ltd and Southern Cross Pipelines (NPL) Australia Pty Ltd are APA Group entities. Alinta Energy GGT Pty Ltd is an entity within the Alinta Energy Group.
 
Construction of the GGP, and its subsequent operation, have been facilitated by an agreement between the Goldfields Gas Transmission Joint Venture participants and the State of Western Australia, which was ratified by the Goldfields Gas Pipeline Agreement Act 1994.
 
The Goldfields Gas Transmission Joint Venture participants assigned the tasks of developing and operating the GGP to a manager.  The manager is Goldfields Gas Transmission Pty Ltd.  Goldfields Gas Transmission Pty Ltd is now an entity within APA Group.
 
The GGP is a covered pipeline under the access regime of the National Gas Law and the National Gas Rules.  However, a part of the gas transportation capacity of the GGP is provided by assets which are uncovered, and that part of the capacity is not subject to the requirements of the access regime.  These uncovered GGP assets are:
 
  • Compressor Unit 3 at Yarraloola, which was installed in 2013;
  • the compressor station at Wyloo West, which was constructed in 2009;
  • Compressor Units 2 and 3 at the Paraburdoo Compressor Station, which were installed in 2007 and 2013, respectively;
  • the compressor station at Turee Creek, which was constructed in 2014; and
  • the compressor station at Ned’s Creek, which was constructed in 2009.
 

Pipeline details

State:

WA

Type:

Transmission

Regulation:

Scheme

Owner:

Alinta Energy, APA

Operator:

Alinta Energy, APA Group

Length:

1,378 km

Gas Type:

Natural gas

Contact us

Title Date Documents
ERA Approved Revised Access Arrangement 2020-2024 2020-01-01 Current access arrangement
ERA Approved Access Arrangement 2020-2024 2019-12-19 Current access arrangement
Minister's decision on revocation of coverage 2004-07-02 Coverage decision
Final recommendation on application for revocation of coverage – NCC 2003-11-27 Coverage decision
Amended access arrangement by order of the WA Electricity Review Board 2012-04-13 Coverage decision
Amended access arrangement (appendix 2.1) by order of the WA Electricity Review Board 2012-04-13 Coverage decision
Amended access arrangement (appendix 3) by order of the WA Electricity Review Board 2012-04-13 Coverage decision
Amended access arrangement information by order of the WA Electricity Review Board 2012-04-13 Coverage decision
ERA approved access arrangement - GGT 2008-12-17 Previous access arrangements
ERA approved access arrangement (appendices) 2005-07-14 Previous access arrangements
ERA approved access arrangement information 2005-07-14 Previous access arrangements
ERA approved access arrangement 2005-07-14 Previous access arrangements
ERA approved access arrangement information 2008-12-17 Previous access arrangements
Amended Access Arrangement Information 2015-2019 2016-06-30 Previous access arrangements
Revised Access Arrangement - Reprinted 21 July 2016 to incorporate corrigenda notice 2016-06-30 Previous access arrangements
Revised Access Arrangement 2015-2019 2016-06-30 Previous access arrangements
Revised Access Arrangement Information 2015-2019 - Reprinted 21 July 2016 to incorporate corrigenda notice 2016-06-30 Previous access arrangements
Pipeline Description Pipeline description